{"id":38226,"date":"2020-05-02T16:30:07","date_gmt":"2020-05-02T11:00:07","guid":{"rendered":"https:\/\/allgujaratnews.in\/?p=38226"},"modified":"2020-05-02T16:30:07","modified_gmt":"2020-05-02T11:00:07","slug":"indian-railways-takes-on-long-pending-major-maintenance-works-of-bridges-and-tracks","status":"publish","type":"post","link":"https:\/\/allgujaratnews.in\/en\/indian-railways-takes-on-long-pending-major-maintenance-works-of-bridges-and-tracks\/","title":{"rendered":"Indian Railways takes on long pending major maintenance works of Bridges and Tracks"},"content":{"rendered":"<p>To improve safety and operational efficiencies, backend warriors of Indian Railways execute long pending major maintenance works of Bridges and Tracks besides Yard remodelling, Renewal of Scissors Crossover during this lockdown<\/p>\n<p>Pending for several years, they confronted Indian Railways as bottlenecks in different zones across the country<\/p>\n<p>Around 500 modern heavy duty Track Maintenance Machines along with track, signal &amp; Overhead Equipment (OHE) maintainers have worked regularly for 10749 machine days to complete overdue track maintenance of 12270 km plain track &amp; 5263 nos. of Turn outs<\/p>\n<p>Ultrasonic flaw detection (USFD) of 30182 kms of track and 1,34,443 rail welds has been carried out with USFD machine.<\/p>\n<p>Indian Railways planned these works during lockdown period considering it \u2018Once in a lifetime opportunity\u2019 to wipe out these maintenance arrears and take up the execution of work without affecting the train service<\/p>\n<p>Backend warriors of Indian Railways have successfully executed long pending Maintenance works like Yard remodelling, Renewal of Scissors Crossover, Repairs of Bridges during this lockdown. Pending for several years, they often confronted Indian Railways as bottlenecks.<\/p>\n<p>Apart from ensuring\u00a0 supply chains all essential commodities running\u00a0 through parcel trains and freight trains, Indian Railways\u00a0 executed these long pending maintenance works during this lockdown period when passenger services were suspended due to COVID -19.<\/p>\n<p>Indian Railways focused on several long pending overdue maintenance works requiring Traffic block of long durations. These works were pending for several years and were confronting Railways with severe bottlenecks. Indian Railways planned these works during lockdown period considering it \u2018Once in a lifetime opportunity\u2019 to wipe out these maintenance arrears and take up the execution of work without affecting the train service.<\/p>\n<p>Maintenance of assets was taken up regularly to continue the supply chain of essential goods to public.<\/p>\n<p>Around 500 modern heavy duty Track Maintenance Machines along with track, signal &amp; Overhead Equipment (OHE) maintainers have worked regularly for 10749 machine days to complete overdue track maintenance of 12270 km plain track &amp; 5263 nos. of Turn outs.<\/p>\n<p>Health of the track has been monitored through periodic runs of Oscillation Monitoring System (OMS) cumulating 1,92,488 kms. of track at 5362 peak locations indicated by OMS test has been attended to ensure proper quality. Ultrasonic flaw detection (USFD) of 30182 kms of track and 1,34,443 rail welds has been carried out with USFD machine. Critical summer precaution activities like de-stressing of long welded rail (LWR)which involved huge men power has been taken up with a new procedure for carrying out the\u00a0 work with ensuring social distancing norms. 2,246 kms of de-stressing of LWR has been done.<\/p>","protected":false},"excerpt":{"rendered":"<p>To improve safety and operational efficiencies, backend warriors of Indian Railways execute long pending major maintenance works of Bridges and Tracks besides Yard remodelling, Renewal of Scissors Crossover during this lockdown Pending for several years, they confronted Indian Railways as bottlenecks in different zones across the country Around 500 modern heavy duty Track Maintenance Machines [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"tdm_status":"","tdm_grid_status":"","spay_email":"","footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false},"categories":[4368,7791],"tags":[5978,4821,6992,7794,8031,7075,8032,7793,7792,115],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/paUKPQ-9Wy","_links":{"self":[{"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/posts\/38226"}],"collection":[{"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/comments?post=38226"}],"version-history":[{"count":1,"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/posts\/38226\/revisions"}],"predecessor-version":[{"id":38228,"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/posts\/38226\/revisions\/38228"}],"wp:attachment":[{"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/media?parent=38226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/categories?post=38226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/allgujaratnews.in\/en\/wp-json\/wp\/v2\/tags?post=38226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}